The complete university platform — video lectures, PDF notes with offline access, interactive quizzes, real-time chat, and progress tracking. Built for students and instructors.
Stream from YouTube or Google Drive with screenshot protection, rotation support, and a distraction-free player.
PDFs auto-download in the background. Open them offline anytime — no internet needed for studying.
Difficulty-weighted question banks, timed exams, practice mode, main & makeup quizzes, and instant grading.
Message your instructor directly. Course-specific channels, voice messages, file attachments, and read receipts.
Never miss an announcement, new lecture, quiz deadline, or grade update. Instant alerts to your device.
Instructors post announcements with images, PDFs, and exam details — pinned to the top of each course so nothing gets missed.
Quiz results reach students the moment you release them — score, percentage, attempts, and a correct/wrong breakdown, all in-app.
One account, every course. Students switch between enrolled courses instantly; instructors manage them all from a single dashboard.
Study at night without eye strain. Full dark theme across every page — toggle anytime from settings.
See every student's completion rate, quiz grades, and engagement across all your courses in one sortable table.
View scores, attempts, correct/wrong breakdowns, and grant retries per student — all from the admin panel.
Create courses, upload lectures, manage visibility, assign moderators with granular permissions.
Course-specific channels, red card warnings, chat disable per student, and voice message support.
Free for students and faculty members. No account required to download.
Full admin panel, lecture management, quiz editor, student statistics, and progress reports.
Windows Install Download v1.3.6Student app with offline PDFs, push notifications, quizzes, chat, and full progress tracking.
Google Play Store Download v1.3.6Join 500+ students and faculty members already using LectraHub.
Download Free